Pensacola Bay Bridge

view from above Pensacola Bay Bridge
Client:

Florida Department of Transportation District 3

Halff is a major subconsultant for construction engineering and inspection on the SR 30 (U.S. 98) Pensacola Bay Bridge replacement project that expands from Escambia County to Santa Rosa County.

This is a 1,770-day, $398.5 million design-build project that constructs two new bridges across Pensacola Bay to replace the old bridge built in 1960. These bridges comprise a major east/west corridor and a hurricane evacuation route.

The new bridges will be constructed parallel and to the west of the existing bridge and have three 12-foot travel lanes, a 65-foot vertical clearance and 150-foot horizontal clearance for marine traffic. Architectural elements include a center arch and shaded observation points along the multiuse path.

Pensacola Bay Bridge under construction above water
construction workers building bridge at Pensacola Bay
aerial view of Pensacola Bay Bridge
cranes at Pensacola Bay Bridge construction site
crane laying poles for Pensacola Bay Bridge
construction at Pensacola Bay Bridge
aerial view of Pensacola Bay Bridge construction
Pensacola Bay Bridge under construction above water
construction workers building bridge at Pensacola Bay
aerial view of Pensacola Bay Bridge
cranes at Pensacola Bay Bridge construction site
crane laying poles for Pensacola Bay Bridge
construction at Pensacola Bay Bridge
aerial view of Pensacola Bay Bridge construction

Halff Services
Involved

  • Construction Services

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us