South Texas College, Pecan Campus – Thermal Plant Expansion

South Texas College pipe and valve systems
SIZE:

3,200 sf

Client:

South Texas College

This project involved the preparation and development of construction documents for a new 3,200-sf building to house offices and mechanical systems. The HVAC system included three 500-ton magnetic bearing chillers, associated pumps and towers to serve three current and two projected buildings on the campus.

South Texas College Pecan Campus exterior
South Texas College thermal plant pipe systems
thermal plant chiller and piping system South Texas College
thermal plant chiller with large pipe system South Texas College
South Texas College Pecan Campus exterior
South Texas College thermal plant pipe systems
thermal plant chiller and piping system South Texas College
thermal plant chiller with large pipe system South Texas College

Halff Services
Involved

  • MEP Engineering

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us